CMRL Revises Chennai Airport-Kilambakkam Line Design to Cut Costs
CMRL has revised the design for the Chennai Airport-Kilambakkam metro line, aiming to reduce construction expenses. The redesign, which lowers the height of the
Project leads for your business
CMRL has revised the design for the Chennai Airport-Kilambakkam metro line, aiming to reduce construction expenses. The redesign, which lowers the height of the
Selection of the Operation and Maintenance (O&M) contractor for Chennai Metro Rail Phase II, covering Corridors 3, 4, 5, and depots. The bid due date is 20-Nov-
Construction of New Lift Shaft and Connecting Passage at Rohini West and Rithala Metro Stations of Line-1. The bid due date is 17-Sep-2024. Tender ID: 2024_DMRC
The Union Government has approved the extension of Pune Metro Phase-1 southward from Swargate to Katraj. The new stretch will cover approximately 5.5 kilometres
Design, Manufacture, Supply, Installation, Testing Commissioning of Platform Screen Doors for CMRL Phase II Light House Metro to Alapakkam Metro of Corridor 4.
Design and Construction of Twin Tunnel by Shield TBM, Tunnel by Cut and Cover, Underground Ramp at Rukanpura and Three Underground Metro Stations Including Arch
Design, Manufacture, Supply, Testing, Commissioning and Training of 39 No. Standard Gauge Cars for Bhubaneswar Metro Project. The bid due date is 29-Aug-2024. T
Package IN 05 Design and Construction of Twin Tunnel Up and Down by Shield TBM, Cut and Cover, Cross passages with or without sump, Ramps, Seven UG Stations inc
Work Contract for Miscellaneous Signaling Works for the period of 1 year. The bid due date is 19-Aug-2024. Tender ID: 2024_DMRC_816848_1.