Maintenance of way-side Lubricators for DMRC network
Comprehensive Maintenance of 16 nos. of Way-side Lubricators installed on Track in Line-1 and Line-3 of DMRC Network. The bid due date is 18/02/2022. Â…
Project leads for your business
Comprehensive Maintenance of 16 nos. of Way-side Lubricators installed on Track in Line-1 and Line-3 of DMRC Network. The bid due date is 18/02/2022. Â…
Supply, installation, testing, commissioning and training of Electrical, Fire protection and VAC works for 18 Elevated stations from Power House StatiÂ…
Construction of Three Underground Stations at Adyar Depot, Indira Nagar and Taramani Road Junction. The bid due date is 07/04/2022. (2022_CMRL_666724_Â…
GR Infraprojects Limited has emerged as the lowest bidder for the Contract NGNC-01: Part Design And Construction Of Elevated Viaduct And 5 Elevated Stations Viz Noida Sec-122, Noida Sec-123, GR.…
DMRC has awarded the contract to L&T for the design and construction of twin tunnel by shield TBM, Tunnel by cut and cover, underground ramp at Rajendra Nagar and Six…
The Agra Metro is being built by the Uttar Pradesh Metro Rail Corporation (UPMRC). The first Arch Girder of the Agra metro project was recently cast, according to the implementing…
SBI has appointed Aurionpro Solutions Limited as the Solution Provider for Kanpur Metro Project (KMP) under Uttar Pradesh Metro Rail Corporation Limited (UPMRCL) for implementation of NCMC based Automatic Fare…
Sam India Builtwell has bagged a contract from DMRC towards undertaking architectural finishing works under Package DC-10 B-R for the Delhi Metro Project - Phase IV
G R Infraprojects has bagged works contract from Bangalore Metro Rail Corporation (BMRCL). The scope of work includes construction of elevated structures (viaduct stations) of length approximately 7.50 km from…