CAMC of Environment Control and Tunnel Ventilation Systems for DMRC Line-6
CAMC of Environment Control System (ECS) and Tunnel Ventilation System(TVS) for 05 Years for 07 UG Stations (Janpath to Kashmere gate) of Line-6 and CAMC of HVA
Project leads for your business
CAMC of Environment Control System (ECS) and Tunnel Ventilation System(TVS) for 05 Years for 07 UG Stations (Janpath to Kashmere gate) of Line-6 and CAMC of HVA
RVNL has bagged a contract for constructing a 4.519 km elevated viaduct from Pimpri Chinchwad to Nigdi (Bhakti Shakti) on the North-South Corridor of the Pune M
Design and construction of underground road tunnel from Gaimukh to Fountain Hotel Junction on Thane Ghodbunder road. The bid due date is 19-Sep-2024. Tender ID:
Design, Supply, Installation, Testing and Commissioning of Telecommunication System for Nagpur Metro Rail Project Phase-2. The bid due date is 26-Aug-2024. Tend
Jakson has been awarded the lowest bidder (L1) status for electrical and mechanical (E&M) and various other works for Corridor-V of Chennai Metro Rail Project P
Construction of BCC equipment rooms and Theatre at existing S and T repairshop in Peenya Depot and Annex. Admin building at Baiyappanahalli Depot of Bangalore M
Design and Construction of Twin Tunnel by Shield TBM, Tunnel by Cut and Cover, Underground Ramp at Mithapur and Three Underground Metro Including Architectural
Design and Construction of Twin Tunnel by Shield TBM, Tunnel by Cut and Cover, Underground Ramp at Rukanpura and Three Underground Metro Stations Including Arch
The East-West Metro project has been bolstered by a substantial allocation of Rs 906 crore in the Union Budget 2024-25. This funding includes an additional Rs 4