Up-gradation from Nuhkhas to Etah section to two lane in Uttar Pradesh
Rehabilitation and Up-gradation From Km. 51.600 to Km. 75.700 of NH-321G Nuhkhas to Etah section to two lane with paved shoulder configurati
Project leads for your business
Rehabilitation and Up-gradation From Km. 51.600 to Km. 75.700 of NH-321G Nuhkhas to Etah section to two lane with paved shoulder configurati
The Delhi Metro Rail Corporation (DMRC) plans to construct a subway connecting the WTC Nauroji Nagar with the Bhikaji Cama Place Metro stati
Construction of Raebareli Ring Road Phase-II with four lane configurations (Design Length 21.888 km) for Rae-Bareli City in the state of Utt
Construction of four-laning with paved shoulder from Mysore to Kushalnagara NH-275 Km 195.550 at Yalachahalli Near SH-117 Yelawala KR Nagara
Widening from two lanes with a paved shoulder to four lanes with a paved shoulder and strengthening in Km 0/8-17/6, 18/0-25/0, 25/500-27/900
Arunachal Pradesh's unstable soil conditions and frequent landslides provide hurdles for the road-building industry, thus the Border Roads O
Construction of FOB near Passport Office at design km 4.200 of Elevated Samrala Chowk section of NH-95 (new NH-05) in the State of Punjab. T
Widening and reconstruction to 4 Lane/4 lane with Service road including structures from Pokhria More at km 47.600 (Ex. Km 50.230) to Govind
Improvement of Vadodara - Surat from 108.700 to 263.000 on NH-48 through Overlay in the State of Gujarat. The bid due date is 27-Sep-2022. T