The Ratle Hydroelectric Plant is a run-of-the-river hydroelectric power project currently under construction on the Chenab River, downstream of the village near Drabshalla in Kishtwar district of Jammu and Kashmir (U.T). The project includes a 133m tall and 195m-long gravity dam and two power stations adjacent to one another. The combined capacity of both the power plants will be 850 MW. The estimated project cost at November-2018 price level is INR 5281.94 Crore. The project is being implemented by a joint venture company between JKPDC and NHPC.