7 MW waste-to-energy plant at Mohali

The civic body is the nodal agency to build a 7 megawatt (MW) waste to energy plant over 50 acre of land at Simgauli village in Mohali district under the Build Own Operate (BOO) model. The Memorandum of understanding is signed with NTPC Ltd in this regard. The power will be generated from 600 tonnes per day (TPD) waste collected from Mohali and Patiala. The completion is targeted in two years.

Location: Mohali Punjab

Estimated Value (Rs. Cr): NA

Sector: Waste-to-Energy

Project Stage: Conceptual / Planning