24 MTPA integrated steel plant in Kendrapara
The Government of Odisha has approved ArcelorMittal Nippon Steel's (AM/NS) proposal to build a 24 MTPA integrated steel plant in Kendrapara's Mahakalpara block. There is a total investment of INR…
Access New projects in India with contacts
The Government of Odisha has approved ArcelorMittal Nippon Steel's (AM/NS) proposal to build a 24 MTPA integrated steel plant in Kendrapara's Mahakalpara block. There is a total investment of INR…
Uttam Galva Metallics has filed an Industrial Entrepreneur Memorandum (IEM) to undertake manufacturing of Pig Iron and Liquid Iron at Wardha, Maharashtra. The capacity will be 700000.00 MTS.
Chhabra Ispat is seeking environment clearance for the expansion of existing plant from 62,400 TPA Billet production to 207,900 TPA Rolled production by modification of existing 2x8 Tons Induction Furnaces…
L N Metallics proposes to set up 0.112 MTPA MS Billets, 0.112 MTPA TMT/ Structure/ MS Strip, 0.04 MTPA Ferro Alloys, 0.1 MTPA Sponge Iron, 0.6 MTPA Iron ore Beneficiation,…
PTCL Infrastructure has filed an Industrial Entrepreneur Memorandum (IEM) to undertake beneficiation of iron ore at Keonjhar, Odisha. The capacity will be 1500000.00 Tonne.
Establishment of Sponge Iron unit (2,25,000 TPA), Induction Furnace with matching LRF & CCM (Billets / Ingots / Hot Billets) (2,40,000 TPA), Rolling Mill (TMT Bars /Structural Steel) (2,25,000 TPA),…
JSW Steel is seeking environment clearance for the expansion of Integrated Steel Plant (16 MTPA to 18 MTPA) and captive power Plant 1490 MW, located at Vijayanagar Works Toranagallu Village,…
Narbheram Power is seeking Terms of Reference (ToR) from the Environment clearance authority for the proposed 2.4 MTPA (2x1.2 MTPA) Iron Ore Pellet Plant over an area of 42.04 acre…
JSPL is seeking Terms of Reference (ToR) for the expansion of steel plant from 3.6 MTPA to 12.6 MTPA, located at Villages: Kalmi, Gorka, Kokaditarai and Kosamapali, Tehsil & District:…
Jindal Steel is seeking amendment in environment clearance for the proposed removal of the facility of 5.0 MTPA Pellet plant and partially 3.1 MTPA Rolling Mill (Hot Strip mill) from…
Sharu Industries plans to expand its existing steel manufacturing unit from the current capacity of 29,500 TPA of Steel Ingots/Billets to 1,00,800 TPA capacity, and 78,000 TPA of Round/Flat/Patra by…
Greenfield Integrated Steel project comprising establishment of Iron ore beneficiation (20,00,000 TPA), Pellet Plant (15,00,000 TPA), Sponge Iron (4,62,000 TPA) (DRI Kilns: 4x350 TPD), Induction Furnace (3x30T) with matching LRF…
Fuletra Steel proposes Greenfield metallurgical unit for Sponge Iron: 1,80,000 TPA (DRI Kiln: 1x550 TPD), Billets or TMT: 2,16,000 TPA along with Captive Power Plant: 20 MW, located at Village…
Expansion and augmentation of integrating melting and rolling facility by at Plot no.6 & 6A, Industrial Area Phase 2, Kala Amb, Tehsil-Nahan, District Sirmaur, Himachal Pradesh.
Establishment of Iron ore beneficiation of 1.5 MTPA capacity, Pellet Plant of 1.2 MTPA capacity, 3x600 TPD DRI Kilns to produce 5,94,000 TPA of Sponge Iron, 8 x 20 T…