Six lane access controlled section of NH-150C from Julekal
Construction of Six-Lane Access Controlled GH section of NH-150C from Julekal Village (Km 242.200) to Kurnool town terminating on NH-40 (Km 280.400) a
Access New projects in India with contacts
Construction of Six-Lane Access Controlled GH section of NH-150C from Julekal Village (Km 242.200) to Kurnool town terminating on NH-40 (Km 280.400) a
DCM Nouvelle is building a new plant at Hisar, Haryana. The capacity of this new production line will be approximately 43,776 spindles. With this new plant in place, the overall…
Online bids are invited for authorization of Jawaharlal Nehru Port Trust (JNPT), Navi Mumbai to Navi Mumbai International Airport (NMIA) Petroleum and
The Ministry of Road Transport and Highways has recently sanctioned Rs 467.41 crore to the state government for improvement work of the existing Maram-Peren section (34.494 km) of
Sushee Infra & Mining Limited is implementing NHIDCL's project comprising two laning of Khupa-HayuliangHawai Road on EPC basis from design Km. 0.000 (Khupa) to Km. 17.000 [Existin
Rehabilitation and Upgradation to 2 Lanes with paved shoulder configuration of Akluj Velapur Sangola of NH965G Design chainage from Km 160/400 to 184/
The expansion of India’s airport sector is crucial to ensuring seamless connectivity for both domestic and international travellers. Airports have evolved into global growth hubs. Apart from providing basic transportation…
Shyam Metalics is in the process of setting up an aluminium foil rolling mill complex at Pakuria in West Bengal. The unit will have an annual rolling capacity of 40,000…
CIDCO is developing four elevated corridors under the Navi Mumbai Metro project. The project is under implementation in four phases. The Phase-I comprising 11.10 km, starts at the
SITC of SCCTV Cameras at International Air Cargo Terminal, Mangalore Airport. The bid due date is 09/02/2022. (Tender ID: 2022_AAICL_102982_1).
Providing Fire Alarm and Fire Fighting System for Rural Hospital Nesari, Tal. Gadhinglaj, District: Kolhapur. (Estimate No. 113358 of 2021-2022). The
Sunteck Realty, plans to develop an aspirational luxury integrated residential township, spread over 50-acre land parcel at Shahad in Kalyan. The project would be developed, under
Rishi Pranaya Phase 1 project is coming up at New Town, Kolkata East. The project is spread over 2.7 acres, offers 2-3 BHK apartment configuration. The amenities and facilities include…
Development of Escape Reservoir at RD 1356 of IGMN for storage of excess water for JJM schemes. The completion is targeted in 18 months. The bid due d
Consultant to provide Key personnel to assist Departmental Authority's Engineer for Supervision of construction of 5 high level bridges at 379/000 km