Chennai Metro Phase-II comprises 118.9 km of three metro corridors – corridor 3 from Madhavaram to SIPCOT; corridor 4 from Lighthouse to Poonamallee; and corridor 5 from Madhavaram to Sholinganallur. Japan International Cooperation Agency (JICA) has agreed to fund 52 km of the metro rail network. The work on the 52-km stretch between Madhavaram and Taramani is likely to be taken up by June, 2020.
Location: Chennai Tamil Nadu
Estimated Value (Rs. Cr): 69180
Sector: Metro Rail
Project Stage: Conceptual / Planning