ASCDCL plans to increase the water supply by 5-10 MLD. The projects include construction of 1.3 ML capacity pump & pump house along with a 2.125 ML capacity elevated storage reservoir (ESR) on Jubilee Park pump house campus and allied works. The other works include laying 500 mm & 450 mm pipelines from Jubilee Park to Delhi Gate GSR.
Location: Aurangabad Maharashtra
Estimated Value (Rs. Cr): 12.5
Sector: Water Sector
Project Stage: Tendering